One Crew, One Programme
Removal and roofing are booked as a single job, so the new roof goes on straight after the strip-out instead of waiting on a second contractor’s calendar.
Motorway suburbs, bush sections and the west coast.
We reply within one working day, often the same morning.
West Auckland asks a lot of a roof. Some sit under native bush and collect leaf litter all year. Some take Tasman spray at Piha or Muriwai. A great many sit on 1950s and 60s sections, built in the years asbestos cement was a standard roofing material.
Between 1945 and 1960, Te Atatū was the second fastest-growing area in Auckland. Glen Eden’s population tripled between 1951 and 1961.
We replace those roofs as one job. Our asbestos roof replacement takes in everything from the WorkSafe notice and licensed strip-out to cleaning the ceiling space and fixing down new long-run COLORSTEEL®, with the same team throughout. A typical single-storey home takes 5 to 7 working days once we’re on the roof, though a steep bush section or a beachfront batch gets planned on its own terms.
Roof photoWest Auckland is easier to read by landscape than by suburb. Each part of it has its own typical roof.
The usual replacement across West Auckland
Corrugate, 5-rib or tray profile, in a colour that suits the house. In the bush around Titirangi and Laingholm, darker colours that sit back into the trees are a popular choice.
Long-run sheets arrive cut to length, which matters on narrow, winding bush roads where a truck can’t always get near the house. We plan the delivery and carrying route at the site visit, along with the long-run steel re-roof profile and grade.
Roof photoA sloping site changes how the whole job runs. Scaffolding has to be built off uneven ground, sheets often come down by hand rather than straight into a skip, and branches over the roof need trimming back before work starts.
Shaded roofs under bush also tend to be the most weathered. Owners sometimes ask whether a mossy old roof can be sealed instead, and our asbestos roof sealing assessment gives you a straight answer. Sheets that are breaking down on the surface are rarely a good candidate.
COLORSTEEL® replacement · AucklandA Piha batch and a Henderson Valley packing shed often have similar roofs: simple single-skin sheeting on light framing, usually a long carry from the nearest skip.
We quote batches like any house, with the steel grade matched to how close it sits to the surf. Sheds and barns are quoted per site, and doing the shed and house roofs in the same visit saves a second set-up.
Encapsulation · AucklandWest Auckland has the toughest coastline of any part of the city for a roof.
On the open beaches at Piha, Muriwai, Karekare and Te Henga, breaking Tasman surf throws salt a long way inland. NZ Steel’s warranty guide reflects that with wider west coast bands. Anything within 50 metres of the high-water mark is classed extremely severe, 50 to 500 metres very severe, and 500 metres to a kilometre severe.
COLORSTEEL MAXAM® isn’t recommended in extremely severe conditions, and its perforation warranty drops to 20 years. For beachfront and anything close to the surf, COLORSTEEL ALTIMATE® is the better call, with a perforation warranty of 25 to 30 years in the harshest categories.
The harbour edges are gentler. Te Atatū, Herald Island, West Harbour and Hobsonville sit on the upper Waitematā, and Titirangi, Laingholm and Green Bay look over the Manukau. Calm salt water still affects the grade a house needs close to the foreshore, so we check every coastal address against NZ Steel’s categories before quoting.
COLORSTEEL® replacement · AucklandOne Crew, One Programme
Removal and roofing are booked as a single job, so the new roof goes on straight after the strip-out instead of waiting on a second contractor’s calendar.
Paperwork for Your Records
You receive the clearance certificate, air monitoring results, disposal manifest and a copy of the WorkSafe notification. Keep them with the title documents. They answer the questions a buyer, insurer or future builder will ask.
Our Five-Year Workmanship Guarantee
The roofing we install is guaranteed for five years, and the steel itself carries its own NZ Steel warranty.
Inspection & Testing
A free visit to measure the roof, check the framing and take a lab sample if needed. On bush and coastal sites we also work out access, carrying routes and any trees that need trimming.
Material & Colour Selection
Profile, colour and steel grade are confirmed, with coastal addresses matched to the right NZ Steel environment band.
WorkSafe NZ Notification
WorkSafe is told at least five days ahead of removal, as the regulations require.
Asbestos Removal
The sheets are kept damp throughout, lifted off with as little breakage as possible, then double-wrapped and labelled for disposal.
Structural Prep & Cavity Decontamination
Old purlins are checked for rot and borer, and anything unsound is replaced. Then the ceiling space is cleaned of any debris the old roof shed over the years.
Insulation & Underlay
Roof blanket can go in at this point, under new underlay laid right across.
New Roof Installation
The new roof is fixed down along with flashings, ridging and barge flashings. Spouting gets replaced too if it's asbestos cement or past its best.
Inspection, Clearance & Handover
After a clearance inspection, we hand over the documents and walk the finished roof with you.
Most West Auckland jobs land within these guide ranges. Every quote is itemised after we've seen the roof and the access.
| Property | Roof area | Guide price | Typical time |
|---|---|---|---|
| Garage, carport or sleepout | 25-50 m² | 5,500-12,000 | 1-2 days |
| Batch, unit or small home | 80-120 m² | 15,000 - 25,000 | 4-5 days |
| 1950s-60s home, Glen Eden or Te Atatū | 130-180 m² | 20,000-35,000 | 5-7 days |
| Larger or two-storey home | 200-280 m² | 30,000-55,000 | 7-10 days |
| Orchard shed, barn or commercial roof | Varies | Quote per site | Varies |
Yes. Sloping sites need scaffolding built to suit the ground, and sheets often have to be carried or lowered by hand to wherever the truck can park. We plan all of that at the site visit and include it in the quote.
Yes. Beachfront batches usually need COLORSTEEL ALTIMATE® rather than MAXAM®, because the first 50 metres from the high-water mark on the west coast is classed extremely severe. The site visit is free there too.
Sometimes, if the sheets are still sound. Moss and lichen hold moisture against the surface for years, though, and a lot of shaded West Auckland roofs are too weathered for a coating to be worth it. We’ll tell you which way your roof sits after looking at it.
Only if it’s under 10 square metres of non-friable material. Anything larger needs a licensed removalist, and weathered sheets can count as friable, which needs a Class A licence. The 10 square metre rule for removing asbestos yourself has a few more conditions worth reading before you pick up a drill.
Yes, we replace those too. Larger sheds are quoted per site, and doing the house and outbuildings in one visit usually saves on set-up costs.