Decramastic Roof Tiles Conversion in Auckland

Remove Old Decramastic. Check For Asbestos. Install The New Roof.

60s - 80s
Common Decramastic Era
Class A
WorkSafe Licensed
5 - 7
Typical Working Days
New Roof
Long-Run Or Metal Tile
To COLORSTEEL® SteelTo New Metal TileWith Asbestos RemovalAsbestos UnderlayHeritage ConversionInsurance Claim Support
Free Quote

Book Your Decramastic Roof Conversion Quote

Tell us about your roof and we’ll help confirm if asbestos testing, removal and replacement roofing should be included.

Local Specialists For Decramastic Roofs

Auckland’s Specialists In Decramastic Roof Conversion

Auckland’s dedicated team for Decramastic roof conversion. Backed by Total Roofing’s decades of roofing experience and a WorkSafe NZ Class A asbestos removal licence, we convert old Decramastic roofs across Auckland into long-run COLORSTEEL® or modern pressed metal tile systems.

Decramastic roofs were common on New Zealand homes from the 1960s through to the 1980s. Many older Decramastic-style roofs may contain asbestos in the bituminous coating, mastic layer, underlay or related roof materials. Visual inspection alone cannot confirm this, so testing is the safest starting point before removal, repairs, restoration or re-roofing begins.

This matters because a Decramastic conversion can expose more than the visible tile. Once the old roof covering is lifted, asbestos-containing underlay or sarking may be found beneath. If asbestos is present, the job needs to be handled by a licensed asbestos removal team, not treated like a standard roof tear-off.

Book A Decramastic Roof Conversion Quote
Roof photo
Auckland · COLORSTEEL® re-roof
Three Decramastic Conversion Services

Three Decramastic Conversion Pathways

Once the old Decramastic roof is removed, the next question is what should replace it. We usually recommend one of three pathways depending on the property, roof structure, asbestos test results, budget and preferred appearance.

Decramastic To Long-Run COLORSTEEL®

A practical conversion from old Decramastic tile to modern long-run steel

For many Auckland homeowners, the most straightforward Decramastic conversion is to remove the old pressed metal tile roof and replace it with long-run COLORSTEEL®.

This option gives the property a cleaner, simpler roofline and can suit homes where the owner wants a modern metal roof rather than another tile-style finish. Profile options may include corrugate, 5-rib, trapezoidal or tray-style roofing, depending on the home’s architecture, roof pitch and budget.

The conversion process can include asbestos testing where required, safe tile removal, underlay assessment, disposal, roof structure checks, new roofing underlay, long-run steel installation, flashings, ridge cappings and spouting integration.

Roof blanket insulation can also be discussed while the roof is open, especially where the existing roof has little insulation or where rain noise is a concern.

Get a Free Quote
Asbestos removal · Auckland

Decramastic Conversion With Confirmed Asbestos

Licensed asbestos removal where asbestos is found in the tiles, coating or underlay

That can include WorkSafe NZ notification where required, controlled site setup, exclusion zones, wet-method removal, careful handling, waste wrapping, approved disposal and clearance documentation where required.

Once the asbestos-containing material has been removed and the roof area is prepared, the replacement roof can be installed. This may be long-run COLORSTEEL®, modern pressed metal tile or another specified roofing system suited to the property.

The key advantage is coordination. The asbestos removal and re-roofing stages are planned together, which helps avoid delays, handover gaps and surprise scope changes once the old tiles are lifted.

Get a Free Quote
COLORSTEEL® replacement · Auckland
Most Decramastic Roofs Need Replacing Now

Why Many Auckland Decramastic Roofs Are Near The End Of Their Service Life

Many original Decramastic roofs installed across Auckland are now several decades old. Some are still performing reasonably well, but many are showing the same wear patterns: stone-chip loss, denting, corrosion, moss, lichen and failing fixings.

A roof assessment is important because some Decramastic roofs may be suitable for short-term maintenance, while others are better treated as a replacement project.

Stone Chip Loss

Decramastic roofs rely on a textured chip coating for protection and appearance. Over time, UV, rain, age and weather exposure can loosen this coating.

Once the chip layer wears away, bare or weakened areas can become more vulnerable to corrosion and water entry.

Tile Dents And Distortion

Decramastic tiles are lightweight pressed metal tiles. Foot traffic, old aerial work, gutter cleaning, solar work or general maintenance can leave dents.

Dented tiles can hold water, distort laps and make the roof harder to maintain.

Moss, Lichen And Biological Growth

The textured surface can hold moisture, especially in shaded or south-facing areas. Moss and lichen can accelerate deterioration, block gutters and make the roof look tired.

Cleaning may help in some cases, but on older roofs it can also disturb fragile surfaces, so assessment is important before high-pressure washing or restoration work.

Wind Lift And Loose Fixings

Older Decramastic roofs can suffer from loose nails, lifted edges, damaged laps or individual tile movement. Auckland wind and storm events can make those issues worse over time.

Once tiles begin lifting, the risk of water entry and further roof damage increases.

Possible Asbestos Exposure Risk

Not every Decramastic-style roof contains asbestos, but older systems may. The risk increases when the roof is deteriorating, being repaired, cleaned, removed or disturbed.

If the roof is old, shedding chip, moss-covered, dented or being prepared for re-roofing, asbestos testing should be considered before work begins.
Overlay Or Full Conversion?

Overlay Vs Full Conversion: What You Need To Know

When researching Decramastic roof conversion in Auckland, you will usually come across two options.

The first is an overlay, where a new roofing system is installed over the existing Decramastic roof.

The second is full conversion, where the old Decramastic roof is removed, asbestos is tested and handled where required, and the new roof is installed over a clean, prepared structure.

We focus on full conversion because it gives the property owner a cleaner long-term result.

The Overlay Pitch

Overlay is often promoted as fast, cheaper and less disruptive. In some cases, the existing roof is left in place and a new pressed metal tile or compatible roofing system is installed over the top.

This can reduce upfront cost and avoid opening the roof. For some short-term ownership situations, it may be considered.

But it is not the same as removing the old roof.

The Full Conversion Approach

Full conversion removes the old Decramastic roof and checks what is underneath. If asbestos is present in the tiles, mastic, underlay or associated roof material, it can be removed and documented correctly.

This allows the roof structure to be inspected, damaged battens or purlins to be addressed, new underlay to be installed, insulation to be considered and the replacement roof to go onto a properly prepared substrate.

Why We Usually Recommend Full Conversion

Overlay can leave the old roof and any asbestos-containing material in place. That may create issues later for repair work, solar installation, future re-roofing, insurance questions, due diligence or resale.

Overlay can also add weight to the roof structure because the old system remains underneath the new one. Whether that is acceptable depends on the building and the proposed system, but it should not be assumed.

The upfront saving can be real, but the long-term value is not always clear once future disclosure, structural condition and the eventual second re-roof are considered.

Get a Free Quote
Asbestos removal · Auckland

When Overlay May Still Be Considered

Overlay may be considered in limited cases, such as:

  • A short-term hold property
  • A building likely to be redeveloped
  • A commercial property with a specific lifecycle plan
  • A situation where an engineer, roofer and property owner have clearly assessed the trade-offs

For most Auckland homeowners who want a clean long-term result, full conversion is usually the safer and more complete option.

We will explain the trade-offs at quote stage so you can make an informed decision.

Get a Free Quote
COLORSTEEL® replacement · Auckland
Our Three Commitments

Three Commitments
behind every Conversion.

A Decramastic conversion needs more care than a standard re-roof because there may be asbestos in the tile coating, old underlay or other hidden roof materials. Our process is built around clarity, safety and a proper handover.

WorkSafe NZ Class ASiteSafeNZDAANZ Steel Accredited InstallerRANZ Member
01

One Plan, One Team, One Quote

Many Decramastic conversions involve more than one trade: asbestos testing, asbestos removal, roofing, scaffold, waste handling, clearance and new roof installation.

We coordinate the conversion under one plan. That helps reduce timing issues, handover gaps and confusion over who is responsible for each stage.

One Auckland team. One quote. One point of contact.

02

Honest About What Is Under Your Roof

We do not assume a Decramastic roof is safe to disturb without checking the risk first.

Where asbestos is suspected, testing should be arranged before removal, repair or conversion work begins. This may include checking both the tile material and the underlay, because either can affect the removal process.

You should know what the job involves before work starts, not after the roof is already open.

03

Workmanship Guarantee On Conversion Work

Where we complete the replacement roof, our roofing workmanship is backed by a 5-year workmanship guarantee.

Manufacturer warranties may also apply to the selected roofing product, depending on the product, supplier, environment and installation requirements. These details are confirmed before installation and provided with your handover documentation where applicable.

The Process

Eight Steps.
One Proper Roof Conversion.

08 StagesAsbestos Checked · Roof Replaced
01

Site Visit & Material Check

We inspect the Decramastic roof, review access, check the roof condition and identify whether asbestos testing is required before removal or conversion begins.

Where asbestos is suspected, samples can be sent to an accredited laboratory for confirmation.

02

Itemised Quote

Your quote is prepared around the roof condition, test results where available, replacement option, access, scaffold requirements and any likely extras.

The quote can include conversion to long-run COLORSTEEL®, modern pressed metal tile or another suitable roofing system.

03

Worksafe NZ Notification & Scheduling

If licensed asbestos removal is required, WorkSafe NZ notification is lodged where required. The programme is then scheduled around notification periods, scaffold, material ordering and weather.

Neighbours may also be notified where required.

04

Site Set-Up & Tile Removal

The work area is set up with appropriate safety controls. If asbestos is confirmed, the removal is carried out using licensed asbestos procedures.

Tiles are removed carefully and handled in a way that reduces breakage and unnecessary disturbance.

05

Underlay Assessment & Removal

Once the tiles are lifted, the underlay is checked. If asbestos-containing underlay is confirmed or suspected, it is removed under the required controls and disposed of correctly.

This is one of the key reasons Decramastic conversion should be planned carefully before work begins.

06

Structural Prep & Decontamination

The roof structure is inspected after the old roof is removed. Battens, purlins and roof framing are checked, and any visible issues are discussed before the new roof is installed.

Where required, affected areas are cleaned using suitable asbestos decontamination methods, including HEPA vacuuming where appropriate.

07

New Underlay, Insulation & Roof Install

New roofing underlay is installed. Roof blanket insulation can also be added where suitable.

The selected replacement roof is then installed, whether that is long-run COLORSTEEL®, modern pressed metal tile or another specified system.

08

Clearance, Flashings & Handover

Clearance documentation is arranged where required for asbestos work. Flashings, ridge cappings, valleys, gutters, penetrations and roof edges are completed as part of the final roof system.

You receive relevant handover documents for your property records.

Decramastic Conversion Cost

How Much Does Decramastic Conversion Cost In Auckland?

The table below gives guide ranges for Auckland properties.

The Range · Auckland JobsGuide ranges · Quoted per site
ScenarioRoof AreaTypical Total CostTimeframe
Conversion to COLORSTEEL® Endura, no asbestos confirmed130–180 m²$18,000–$28,0004–6 days
Conversion to COLORSTEEL® Endura, asbestos confirmed in tiles or underlay130–180 m²$22,000–$34,0005–7 days
Conversion to COLORSTEEL® Maxx, coastal site, asbestos confirmed130–180 m²$25,000–$40,0005–7 days
Conversion to modern pressed metal tile, asbestos confirmed130–180 m²$28,000–$44,0006–8 days
Garage or sleepout Decramastic conversion25–50 m²$6,000–$14,0001–2 days
Larger home or two-storey property200–280 m²$30,000–$55,0007–10 days
Guide ranges
These are guide ranges only. Final pricing depends on access, scaffold, roof size, asbestos test results, underlay condition, replacement material, roof pitch, gutter scope, insulation and any structural preparation needed once the old roof is removed.
FAQs: DECRAMASTIC ROOF CONVERSION

Frequently Asked Questions About Decramastic Roof Conversion

01

Does My Decramastic Roof Contain Asbestos?

Older Decramastic-style roofs may contain asbestos in the coating, mastic, underlay or related roof materials. This is more likely on roofs installed before the 1980s, but visual inspection cannot confirm it.

The only reliable way to know is laboratory testing. If the roof is going to be repaired, removed, restored or replaced, testing should be considered before work begins.

02

Can I Paint Or Restore My Decramastic Roof Instead Of Replacing It?

Some Decramastic roofs can be restored if they are still structurally sound and not heavily deteriorated. Restoration may include cleaning, coating or chip resurfacing, depending on the system.

However, restoration does not remove any asbestos-containing material if asbestos is present. It may extend the roof’s useful life, but it is not the same as full conversion or replacement.

If the roof is badly dented, rusting, leaking, shedding chip or asbestos is confirmed, full conversion may be the better long-term option.

03

Should I Overlay A New Roof On Top Of My Decramastic?

We do not recommend overlay for most standard homeowner situations.

Overlay may reduce upfront cost, but it can leave old roof material and possible asbestos in place. It can also make future repairs, solar work, resale due diligence or eventual re-roofing more complicated.

Full conversion gives a cleaner result because the old roof is removed, the structure can be checked, and the new roof is installed over a prepared substrate.

04

How Is Decramastic Different From Modern Gerard, Decra Or Pressed Metal Tiles?

Older Decramastic roofs and modern pressed metal tiles can look similar because both use a tile-style pressed metal shape.

The difference is in the materials, coatings, manufacturing standards and warranty systems. Modern pressed metal tiles are made using current roofing technology and asbestos-free product systems.

People sometimes use “Decramastic” as a general term for stone-chip metal tile roofing, but original older Decramastic systems should be treated separately and assessed before removal or conversion.

05

Can I Stay In The House During Conversion?

In many cases, yes. The work area is controlled during removal, and the roof is managed carefully during the replacement stage.

Some families choose to be away during the noisiest or most disruptive parts of the work. We will explain what is practical and safe for your property before the job begins.

06

How Long Does The Whole Conversion Take?

A standard Auckland home may take around 5–7 working days once site work begins, depending on roof size, access, asbestos test results, weather and replacement material availability.

Larger homes, steep sites, two-storey properties or pressed metal tile conversions may take longer. Material lead times should also be allowed for before work starts.

07

Will My Insurance Cover Decramastic Conversion?

Insurance may contribute if the roof has been damaged by an insured event such as storm, hail, fire or a fallen tree.

Coverage depends on your policy, the cause of damage, the condition of the roof before the event and the insurer’s assessment. Do not assume full replacement is covered until your insurer confirms it.

We can provide photos, an inspection report and an itemised quote if supporting documentation is needed.

08

What Documentation Do I Receive?

Depending on the job, your documentation may include asbestos test results, WorkSafe NZ notification records where required, hazardous-waste disposal records, air monitoring results where applicable, clearance documentation, product warranty information and workmanship guarantee details.

Keep these documents with your property records. They can be useful for future insurance, renovation, due diligence or sale.

09

Why Do You Handle Both Asbestos Removal And Re-Roofing?

Decramastic conversion often involves both roofing and asbestos risk. Splitting the work across separate contractors can create delays, handover gaps and confusion over who is responsible for each stage.

A coordinated approach helps align testing, removal, disposal, roof preparation, new roof installation and handover documentation.

Get A Decramastic Roof Conversion Quote

The hardest part of a Decramastic conversion is knowing what is actually under the roof.

We can help assess the roof, confirm whether asbestos testing is needed, explain the replacement options and provide an itemised quote for the full conversion.